Consumer unit replacement
Power tripping in the whole house? We replace your board with a new one — tested, in one day.
An old board with fuses, no surge protection or a single RCD for everything: after a storm the electronics fail, the washing machine trips the whole house, there is nowhere to connect a charger. A new consumer unit gets separate circuits, surge protection and space for whatever you add later. Installation with removal of the old board takes 4–8 hours.
We reply within 1 working day with a proposed consumer unit and the price including installation. A photo of the open board and your postcode are enough.
Frequently asked questions
How long does a consumer unit replacement take?
Installation at your home usually takes 4–8 hours, with the power off while we work. The consumer unit is built in our workshop beforehand (5–10 working days from the deposit).
Will someone come to look at the board before quoting?
No need — a photo of the open board and your postcode are enough. If anything is unclear, we will call or arrange to look at it during installation.
Can I order just the consumer unit and have my own electrician install it?
Yes — we ship by courier anywhere in Poland with the wiring diagram, circuit chart and the workshop test report. Your electrician does the connection and testing on site.
Do I need to notify the network operator?
Replacing the consumer unit after the meter does not need to be notified. If you are moving the meter or changing your supply capacity, it does — and we will prepare a meter board to the network operator’s requirements.
What if there are fewer cables in the wall than circuits in the new board?
Nothing is wasted: spare ways stay as reserve for the future (charger, air conditioning). During verification we match the number of circuits to what you have — we reuse the existing cables.
Didn't find an answer? Ask a question using the contact form — we reply within 1 working day.